PSI - Scientific and Technical Report 2002

Large Research Facilities / Volume VI

TABLE OF CONTENTS
INTRODUCTION
A.F. Wrulich
1 PDF
ACCELERATOR OPERATION AND ENHANCEMENT
OPERATION OF THE PSI ACCELERATOR FACILITIES IN 2002
A.C. Mezger, A. Lüdeke, P.A. Schmelzbach
4 PDF
SLS: FIRST YEAR OF OPERATION
L. Rivkin
8 PDF
FIRST RESULTS OF THE NEW CURRENT PROBE RRL
M. Humbel, Th. Stammbach, H.-W. Reist, M. Graf
10 PDF
RECONSTRUCTION OF THE BEAMLINE SECTION IN THE CENTRE OF THE 590 MEV CYCLOTRON
H. Reist, D. George, S. Adam, G. Agardi, G. Biemans, K. Gisler, M. Graf, H. Jegge, U. Kalt, R. Kan, J.L. Pochon, D. Suhi
12 PDF
MIGRATION OF THE CONFIGURATION DATABASE FOR PSI CYCLOTRON ACCELERATORS
H. Lutz, D. Anicic, A.C. Mezger
16 PDF
WEB BASED OPERATING MANUAL FOR THE 590 MEV PROTON ACCELERATOR AT PSI
A. Barchetti, M. Humbel, R. Kramer, T. Marder, A.C. Mezger
18 PDF
THE DESIGN AND MANUFACTURE OF THE FAST KICKER MAGNET FOR THE ULTRA COLD NEUTRON FACILITY (UCN)
D. George
20 PDF
FIRST BEAM TESTS WITH THE FAST KICKER MAGNET FOR THE ULTRA COLD NEUTRON FACILITY
U. Rohrer, M. Daum, D. George, F. Jenni, A.C. Mezger
22 PDF
FIRST OPERATION OF DSP-BASED CONTROLLER BOARD
T. Korhonen, D. Anicic, G. Janser, I. Jirousek, A.C. Mezger
26 PDF
STABILITY ASPECTS AND TOP-UP
M. Böge, T. Schilcher, M. Muñoz
28 PDF
COMMISSIONING OF THE SLS THIRD HARMONIC SUPERCONDUCTING RF SYSTEM
M. Pedrozzi, W. Gloor, P. Marchand (SOLEIL), A. Anghel (CRPP Lausanne)
31 PDF
PRECISE BEAM ENERGY CALIBRATION AT THE SLS STORAGE RING
S.C. Leemann, M. Böge
34 PDF
NOISE ENVIRONMENT IN THE SLS STORAGE RING
V. Schlott, M. Böge, T. Schilcher
36 PDF
IMPACT OF NOISE FLOOR AND STRUCTURE VIBRATIONS ON THE PHOTON BEAM STABILITY AT THE SIS BEAMLINE
J. Krempaský, M. Dehler
38 PDF
NEW DEVELOPMENTS FOR THE SLS TIMING SYSTEM
T. Korhonen
41 PDF
SOFTWARE MANAGEMENT AT SLS
R. Krempaská, A. Al-Adwan, A. Bertrand, M. Dach, M. Grunder, M. Heiniger, C. Higgs, S. Hunt, B. Kalantari, R. Kapeller, T. Korhonen, J. Krempaský, A. Lüdeke, D. Maden, W. Portmann D. Vermeulen, D. Zimoch
43 PDF
DATA STORAGE
R. Kapeller, C. Higgs
45 PDF
ACCELERATOR SYSTEMS - THEORY AND DESIGN
BEAM-CAVITY INTERACTIONS IN HIGH-INTENSITY CYCLOTRONS
L. Stingelin
48 PDF
COLD TESTS WITH THE NEW RING CYCLOTRON CAVITY
H. Fitze, M. Bopp
50 PDF
PYFEMAX: A PYTHON FINITE ELEMENT MAXWELL SOLVER
R. Geus (ETHZ), P. Arbenz (ETHZ), L. Stingelin
51 PDF
THE PROSCAN PROJECT: A PROGRESS REPORT
E. Pedroni, J. Duppich, G. Goitein, M. Jermann, M. Schippers and the PROSCAN team
54 PDF
BEAM-DYNAMICS STUDIES FOR THE PROTONTHERAPY CYCLOTRON COMET
J.M. Schippers, V. Vrankovic, D. George
56 PDF
SHIELDING CALCULATIONS FOR PROSCAN
S. Teichmann
58 PDF
A SHIELDING EXPERIMENT FOR PROSCAN
S. Teichmann, B. Amrein, J. Gerig, W. Hajdas, H. Temnitzer
60 PDF
VACUUM SYSTEM OF THE PROSCAN CYCLOTRON COMET
U. Kalt, J. Duppich
62 PDF
THE SURVEYING AND ALIGNMENT FOR THE PROSCAN PROJECT
J.L. Pochon
63 PDF
REQUIREMENTS FOR THE SAFETY REPORT OF THE PROSCAN PROJECT THE EXTENSION OF THE PROTON THERAPY FACILITY AT PSI
W. Roser
65 PDF
THE PREPARATIONS FOR THE NEW GANTRY 2 - A FIRST PROGRESS REPORT
S. Forss
66 PDF
DESIGN OF THE 90 DEGREE DIPOLE MAGNET FOR GANTRY 2
M. Negrazus
68 PDF
OPTICAL DESIGN OF THE PROTON BEAMLINES FOR THE PROSCAN PROJECT
U. Rohrer
70 PDF
LEM - LOW ENERGY MUONS
THE RECONSTRUCTION OF THE SECONDARY BEAMLINE AT THE PSI μE4 AREA

R. Kobler
74 PDF
PERFORMANCE ESTIMATES FOR THE UPGRADED SINQ COLD SOURCE
F. Atchison
76 PDF
NEUTRONIC CALCULATIONS FOR THE SUNS ULTRA COLD NEUTRON SOURCE
F. Atchison
79 PDF
ACCELERATOR MAINTENANCE, PROJECT MANAGEMENT AND DOCUMENTATION ACTIVITIES
INTERESTING TIMES
J. Duppich
82 PDF
COMPILATION AND ORGANISATION OF A PHOTO ARCHIVE
M. Lüthy, J. Duppich
84 PDF
UPGRADE OF THE MAGNETIC FIELD MEASURING MACHINE
R. V. Vrankovic, D. George, D. Anicic, W. Hugentobler, I. Jirousek
86 PDF
A DEVICE FOR SEALING SURFACE RECONDITIONING OF CYCLOTRON CAVITIES
E. Bächli
88 PDF
INVENTORIES FOR ACTIVE-WASTE FROM ACCELERATOR FACILITIES
F. Atchison
90 PDF
MEGAPIE AND QUALITY ASSURANCE
P. Ming
94 PDF
CONTRIBUTION TO THE MEGAPIE PROJECT BY THE SECTION "CO-ORDINATION"
M. Dubs, G. von Holzen
96 PDF
APPENDIX
97 PDF